Kingshead - Single Pod

PROJECT Overview

Historic Setting. Modern Foundations.

Kings Head Inn is a 17th-century four-star inn nestled in Llangennith on the Gower Peninsula, Wales, one of the most breathtaking and unspoiled corners of the British Isles. A destination that blends historic character with modern hospitality, the inn attracts guests from near and far, drawn by the charm of the surroundings and the warmth of what it offers. As EV adoption continues to grow, the inn recognised that providing a reliable charging solution for B&B guests was a natural and necessary next step, ensuring that the experience of staying at Kings Head Inn is as seamless as it is memorable.

When it came to laying the groundwork for that infrastructure, the TetrikPod-1 was the clear choice.

Quick Facts

Client

Kings Head Inn

Location

Gower Peninsula, Wales

Application

EV Charging Infrastructure

Product

TPOD-GA001

Completion Date

April 14, 2026

TPOD-GA001 installed at the Kings Head Inn, Gower Peninsula, Wales.

The Challenge

Installing EV charging infrastructure at a characterful, historic property like Kings Head Inn requires a careful touch. The setting is unique, the environment is cherished, and any installation work needs to be completed efficiently and cleanly, without disrupting the guests or the character of the site. Traditional groundworks approaches often demand multiple visits, one to dig and lay the foundation, and a return visit at a later date to complete the installation. That multi-visit model adds time, adds cost, and adds unnecessary complexity to what should be a straightforward deployment.

The project required a smarter, simpler approach from the ground up.

The Solution

The TetrikPod-1, Tetrik’s single Pod solution, was installed in the Kings Head Inn car park, ready to receive an EV charge point for guest use. Designed specifically for single charge point deployments, the Pod-1 is compact, straightforward, and built to keep projects moving without unnecessary complexity or costly logistics.

The results speak for themselves.

Faster Delivery
All digging and fitting works were completed in a single day. No return visits, no waiting, no extended programme. The TetrikPod-1 is designed to move at the pace that modern projects demand, and at Kings Head Inn it did exactly that.

Zero Lifting Equipment Required
No crane works, no heavy lifting equipment, no logistical headaches. The Pod-1 is designed to be installed without specialist lifting machinery, making it as practical and accessible on a quiet rural site as it is anywhere else.

Reduced Disruption
A single day of works means a single, minimal window of disruption to the inn and its guests, exactly what a working hospitality business requires.

Long-term Infrastructure Performance
The TetrikPod-1 isn’t a shortcut, it’s an engineered foundation built to support EV charging hardware for the long term. The charge point will follow, but the infrastructure beneath it is already in place and built to last.

Build Smarter from the Ground Up

Whether you’re a rural inn, a boutique hotel, or a hospitality business looking to future-proof your guest offering, the TetrikPod-1 is designed to make single charge point deployments fast, simple, and cost-effective, without compromise.

Get in touch with the Tetrik team to find out how the Pod can work for your next project.